Badge time.png   The Paragon Wiki Archive documents the state of City of Heroes/Villains as it existed on December 1, 2012.

Difference between revisions of "Turbine Generator"

From Paragon Wiki Archive
Jump to: navigation, search
m (Also See)
(Additional Information)
Line 7: Line 7:
  
 
==Additional Information==
 
==Additional Information==
 +
[[Image:Turbine_Generator.jpg|right|thumb|200px|Turbine Generator]]
 
{{Base Additional Info
 
{{Base Additional Info
 
|Price=1,500,000
 
|Price=1,500,000
Line 22: Line 23:
 
|AllowedAux=[[Circuit Breaker]]
 
|AllowedAux=[[Circuit Breaker]]
 
}}
 
}}
 +
 
==Also See==
 
==Also See==
  

Revision as of 15:29, 28 January 2008

This article is a stub. You can help the Paragon Wiki by expanding it.

Overview

Description

Portacio Industry's LS-3100 dual-shaft gas turbine can be configured for gas, or gas/water operation. Backed by Portacio's warranty and service network, the LS-3100 is the easy-to-maintain solution to base power needs.

Additional Information

Turbine Generator
Price 1,500,000 prestige
Energy Produced 5000
Crafted at Advanced Worktable
Salvage Required 19 Salvage TechMaterial.png Tech Material
6 Salvage TechPower.png Tech Power
3 Salvage TechHardwareold.png Tech Hardware
1 Salvage TechPrototype.png Tech Prototype
Maximum Connections 2
Allowed "Aux" Items Circuit Breaker

Also See