Badge time.png   The Paragon Wiki Archive documents the state of City of Heroes/Villains as it existed on December 1, 2012.

Difference between revisions of "Turbine Generator"

From Paragon Wiki Archive
Jump to: navigation, search
 
Line 6: Line 6:
 
==Description==
 
==Description==
  
 
+
Portacio Industry's LS-3100 dual-shaft gas turbine can be configured for gas, or gas/water operation. Backed by Portacio's warranty and service network, the LS-3100 is the easy-to-maintain solution to base power needs.
  
  
 
==Additional Information==
 
==Additional Information==
  
Price: [[prestige]]<br>
+
Price: 1500000 [[prestige]]<br>
 
Unlocked by: N/A <br>
 
Unlocked by: N/A <br>
 
Power/Control Requirements: N/A / N/A<br>
 
Power/Control Requirements: N/A / N/A<br>
Energy Produced: <br>
+
Energy Produced: 5000 units<br>
Crafted at: [[# Forge]] <br>
+
Crafted at: [[Advanced Worktable]] <br>
 
Max Connections: 2 <br>
 
Max Connections: 2 <br>
 
Allowed Auxiliary Items: [[Circuit Breaker]]
 
Allowed Auxiliary Items: [[Circuit Breaker]]

Revision as of 21:01, 14 December 2006

Overview

Description

Portacio Industry's LS-3100 dual-shaft gas turbine can be configured for gas, or gas/water operation. Backed by Portacio's warranty and service network, the LS-3100 is the easy-to-maintain solution to base power needs.


Additional Information

Price: 1500000 prestige
Unlocked by: N/A
Power/Control Requirements: N/A / N/A
Energy Produced: 5000 units
Crafted at: Advanced Worktable
Max Connections: 2
Allowed Auxiliary Items: Circuit Breaker


Also See